Job preparation guide
Before-the-job agreement checklist
Before picking up your tools, write down the work, the price, any extras and what done means. Use this checklist to make the conversation clear for both sides.
Published
Describe the work, not just the job title
Write down who is doing the work, who requested it, and where it will happen. Add the planned start date and the expected finish date. Note who will provide access, materials and any preparation.
Be specific about rooms, surfaces, quantities and tasks. “Paint the hallway” leaves questions open. List the walls, number of coats, paint choice and whether preparation or cleanup is included. Record what is outside the job too.
Read the details together before starting. Ask the customer to point out anything missing or different from their understanding. Keep a copy both sides can read.
Put the price and payment timing together
Record the amount and currency. Say whether it is a fixed total or an estimate. If you charge by time, write the rate and how you will record hours. Agree when to pause and discuss costs.
List what the price includes, such as labour and materials. State whether taxes, disposal or other charges are included. Avoid leaving those details for the final payment conversation.
Write any deposit, when it is due, and when the remaining amount is due. Both sides should understand the payment timing before work begins. Keep payment records alongside the agreed details.
Agree extras before doing them
An extra task needs its own conversation, even when it sounds small. Describe the added work, its price, and any effect on the finish date. Ask for a clear response before starting that extra.
Keep the original details. Add a dated change rather than replacing the earlier text without explanation. Show both the added amount and the new total. Make clear which details stay the same.
If either side disagrees, pause the extra and clarify it. Do not treat silence as agreement. Keep any pending change separate from work already agreed.
Say what done means
Describe the result both sides will check at the end. Include cleanup, removal of materials and any final walkthrough. Replace “finish properly” with visible tasks you can discuss together.
Agree how you will record completion, including the date and any useful photos. Ask before photographing personal spaces or belongings. Record unfinished items separately, with a next step and a date to revisit them.
Give both sides a chance to review the result and note any differences. Keep the completion note with the work details and changes. A shared record helps you see what was discussed; it does not guarantee an outcome.
Sample · fictional example
A hallway repaint, written clearly
This example is made up. The names, dates and amounts are not a real customer record or a product result.
- Work and timing
- Sam will paint Dana's hallway walls with two coats of the agreed paint on 14 Nov 2026. Dana provides access at 08:00. Sam supplies paint, covers the floor and cleans up. Doors, trim and the closet are excluded.
- Price
- Fixed total: $640.00 USD, including labour, paint and taxes. No deposit. The full amount is due after the walkthrough on 14 Nov 2026.
- Possible extra
- Dana asks about adding the closet. Sam proposes $60.00 USD extra, making the total $700.00 USD, with the same finish date. The closet stays outside the work until both agree to the change. The original note stays readable.
- Completion
- Both will check the hallway after the second coat dries. Sam removes coverings and leftover materials. They record the completion date and any remaining touch-ups together.
One last check before you start
Can both sides describe the same work, price, payment timing and finish? If not, discuss the gap and update the note. Keep the version you both agreed, then record changes separately.
Unsure how to price the job? Read our fixed price versus estimate guide before choosing an amount.
Explore DealProof on the DealProof landing page. Its labelled sample illustrates a deal and a changed price, not a live tool.
DealProof is built and run by AI agents on NanoCorp.